| Título: | Avaliação quali-quantitativa de não conformidades na etapa de acabamento de uma obra na cidade de Goiânia/GO |
| Título(s) alternativo(s): | Qualitative and Quantitative Assessment of Nonconformities in the Finishing Stage of a Construction Project in Goiânia, Goiás, Brazil |
| Autor(es): | Amorim, Laura Almeida |
| Primeiro Orientador: | Domiciano, Marcela Leão |
| metadata.dc.contributor.referee1: | Domiciano, Marcela Leão |
| metadata.dc.contributor.referee2: | Melo, Matilde Batista |
| metadata.dc.contributor.referee3: | Ferreira, Ricardo de Alcântara |
| Resumo: | A Gestão da Qualidade desempenha papel fundamental na prevenção de falhas, redução de desperdícios e melhoria contínua dos processos construtivos. Nesse contexto, ferramentas como os Procedimentos de Execução de Serviço (PES) e as Fichas de Verificação de Serviço (FVS) auxiliam no controle da qualidade e na identificação de não conformidades capazes de gerar retrabalhos, custos adicionais e atrasos nas obras. Assim, este estudo teve como objetivo identificar e analisar as principais não conformidades observadas na fase de acabamento de uma obra residencial multifamiliar localizada em Goiânia/GO, bem como propor oportunidades de melhoria para o Sistema de Gestão da Qualidade da empresa. Para isso, foram realizadas inspeções em 80 unidades habitacionais, totalizando 667 ocorrências registradas. Os dados foram organizados e priorizados por meio do Diagrama de Pareto e, posteriormente, analisados com o auxílio de Diagramas de Ishikawa elaborados a partir das informações obtidas em campo, das FVS e dos PES. Os resultados demonstraram que mais de 80% das ocorrências estavam concentradas em serviços que impactavam revestimento ou gesso. Entre as não conformidades priorizadas destacaram-se o som cavo em revestimentos, o caimento inadequado para ralos, a ausência de passagem de fiação e os ralos entupidos. As análises indicaram que parte significativa dessas ocorrências estava associada a falhas nos procedimentos executivos, limitações dos mecanismos de controle da qualidade e incompatibilidades entre soluções de projeto e requisitos executivos. Conclui-se que a aplicação integrada das ferramentas da qualidade permitiu identificar as principais causas dos retrabalhos observados, fornecendo subsídios para o aprimoramento dos procedimentos, dos controles de inspeção, da capacitação das equipes e da compatibilização dos serviços, contribuindo para a melhoria contínua do processo construtivo. |
| Abstract: | Quality Management plays a fundamental role in preventing failures, reducing waste, and promoting continuous improvement in construction processes. In this context, tools such as Service Execution Procedures (SEP) and Service Inspection Forms (SIF) support quality control and the identification of nonconformities that may lead to rework, additional costs, and project delays. Therefore, this study aimed to identify and analyze the main nonconformities observed during the finishing phase of a multifamily residential building project located in Goiânia, Goiás, Brazil, as well as to propose improvement opportunities for the company's Quality Management System (QMS). To achieve this objective, inspections were conducted in 80 housing units, resulting in a total of 667 recorded occurrences. The data were organized and prioritized using the Pareto Diagram and subsequently analyzed through Ishikawa Diagrams developed from field observations, Service Inspection Forms (SIF), and Service Execution Procedures (SEP). The results showed that more than 80% of the occurrences were concentrated in finishing and gypsum board services. Among the prioritized nonconformities were hollow-sounding floor tiles, inadequate floor slope toward drains, missing electrical wiring routing, and clogged drains. The analyses indicated that a significant portion of these occurrences was associated with deficiencies in execution procedures, limitations in quality control mechanisms, and incompatibilities between design solutions and execution requirements. It was concluded that the integrated application of quality management tools enabled the identification of the main causes of rework observed in the project, providing support for improvements in execution procedures, inspection controls, workforce training, and service coordination, thereby contributing to the continuous improvement of the construction process. |
| Palavras-chave: | Gestão da qualidade Não conformidades Melhoria contínua Ferramentas da qualidade |
| CNPq: | Engenharias / Área: Engenharia Civil / Subárea: Construção Civil. |
| Idioma: | por |
| País: | Brasil |
| Editor: | Insitituto Federal de Educação, Ciência e Tecnologia de Goiás |
| Sigla da Instituição: | IFG |
| metadata.dc.publisher.department: | Câmpus Goiânia |
| Citação: | AMORIM, Laura Almeida. Avaliação quali-quantitativa de não conformidades na etapa de acabamento de uma obra na cidade de Goiânia/GO. 2026. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) – Instituto Federal de Educação, Ciência e Tecnologia de Goiás, Goiânia, 2026 |
| Tipo de Acesso: | Acesso Aberto |
| URI: | https://repositorio.ifg.edu.br/handle/prefix/2790 |
| Data do documento: | 1-Jul-2026 |
| Aparece nas coleções: | Bacharelado em Engenharia Civil |
Arquivos associados a este item:
| Arquivo | Descrição | Tamanho | Formato | |
|---|---|---|---|---|
| tcc_Laura Almeida Amorim.pdf | 4,08 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.