Use este identificador para citar ou linkar para este item: https://repositorio.ifg.edu.br/handle/prefix/2125
Tipo: Trabalho de Conclusão de Curso
Título: Análise das perdas de protensão imediatas em ponte de concreto protendido: um estudo de caso
Título(s) alternativo(s): Analysis of immediate prestressing losses in prestressed concrete bridge: a case study
Autor(es): Lima, Anna Beatriz Rodrigues de Souza
Primeiro Orientador: Bueno, Mônica
metadata.dc.contributor.referee1: Bueno, Mônica
metadata.dc.contributor.referee2: Assis, Márcia
metadata.dc.contributor.referee3: Carvalho, Eulher
Resumo: Neste estudo, foi realizada uma análise sobre os diversos tipos de protensão, suas aplicações, métodos construtivos e métodos de cálculo das perdas imediatas de protensão. Foram utilizados para confecção deste trabalho dados bibliográficos dos projetos executivos da Ponte sobre o Rio Claro fornecidos pela empresa executora e também os dados obtidos in loco nos atos de protensão das aduelas nas pistas da ponte. Com eles fez-se uma comparação do alongamento teórico determinado em projeto e o valor das leituras do alongamento alcançado no ato da protensão. Utilizando os dados coletados in loco das fichas de protensões executadas na superestrutura da ponte sobre o Rio Claro, localizada no Município de Jataí estado de Goiás, foi possível compreender a necessidade de prever as perdas de protensão, a fim de que o processo seja monitorado e planejado de forma adequada, evitando grandes discrepâncias em relação ao projeto original. Compreender as perdas de carga nas protensões de pontes é fundamental, visto que essas perdas têm potencial para impactar significativamente o desempenho do sistema de protensão, e por conseguinte, a estabilidade e longevidade das pontes que utilizam esse processo construtivo.
Abstract: In this study, an analysis was conducted on various types of prestressing, including their applications, construction methods, and methods for calculating immediate prestressing losses. Bibliographic data from the executive projects of the Bridge over the Rio Claro, provided by the executing company, were used for the preparation of this work. Additionally, on-site data were obtained during the prestressing activities of the arches on the bridge decks. A comparison was made between the theoretical elongation determined in the project and the value of the elongation readings achieved during the prestressing. By utilizing on-site data from the prestressing records carried out on the superstructure of the Bridge over the Rio Claro, located in the Municipality of Jataí, state of Goiás, it was possible to understand the need to anticipate prestressing losses so that the process can be monitored and planned appropriately, avoiding significant discrepancies from the original project. Understanding load losses in prestressed bridge elements is crucial, as these losses have the potential to significantly impact the performance of the prestressing system, and consequently, the stability and longevity of bridges using this construction process.
Palavras-chave: Concreto protendido
Prestressed concrete
Pós-tração
Post-traction
Perdas imediatas
Immediate losses
CNPq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL::ESTRUTURAS
Idioma: por
País: Brasil
Editor: Insitituto Federal de Educação, Ciência e Tecnologia de Goiás
Sigla da Instituição: IFG
metadata.dc.publisher.department: Câmpus Jataí
Citação: LIMA, Anna Beatriz Rodrigues de Souza. Análise das perdas de protensão imediatas em ponte de concreto protendido: um estudo de caso. 2023. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Instituto Federal de Goiás, Jataí, 2023.
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.ifg.edu.br:8080/handle/prefix/2125
Data do documento: 1-Dez-2023
Aparece nas coleções:Bacharelado em Engenharia Civil

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
tcc_Anna Beatriz Rodrigues de Souza Lima.pdfTCC4,28 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.