Use este identificador para citar ou linkar para este item: https://repositorio.ifg.edu.br/handle/prefix/2287
Tipo: Trabalho de Conclusão de Curso
Título: Análise do fluxo de trabalho na concepção de um projeto de instalações hidrossanitárias dentro do processo BIM
Título(s) alternativo(s): Analysis of the workflow in the design of a plumbing installation project within the BIM process
Autor(es): Assis, Gabriel Araújo
Primeiro Orientador: Santos, Francielle Coelho
metadata.dc.contributor.referee1: Santos, Francielle Coelho
metadata.dc.contributor.referee2: Lopes Jr., Ronan
metadata.dc.contributor.referee3: Santos, Victor
Resumo: A metodologia BIM surge como uma aplicação dos conceitos da Indústria 4.0 na construção civil. No entanto, as aplicações desse conceito no contexto dos projetos de instalações prediais ainda não foram totalmente estudadas na literatura. A presente pesquisa apresenta uma análise do fluxo de trabalho da elaboração de projetos de instalações hidrossanitárias dentro do processo BIM. A metodologia da pesquisa foi baseada na realização de entrevistas semiestruturadas com profissionais que estão inseridos nesse processo (modeladores, projetistas, gerentes e etc.). Por meio dos relatos das entrevistas, foi possível identificar doze agentes participantes do processo, divididos em duas cadeias hierárquicas baseadas nos modelos de contratação do projeto. Tais agentes foram caracterizados com base no papel que exerciam no processo e suas atribuições catalogadas nas etapas as quais estavam relacionadas. Dessa forma, foi proposto um fluxograma de trabalho que viabiliza o desenvolvimento do projeto hidrossanitário dentro do processo BIM. O fluxograma foi avaliado pelos mesmos participantes das entrevistas, os quais evidenciaram a viabilidade da aplicação da proposta, bem como seus impactos positivos. A importância dos resultados da presente pesquisa se dá no entendimento do papel dos agentes envolvidos na concepção do projeto e o mapeamento desse processo possibilita a compreensão da cadeia produtiva de maneira semi-linear, observando as relações de dependência entre as atividades e avaliando as etapas em que ocorrem.
Abstract: he BIM methodology emerges as an application of Industry 4.0 concepts in civil construction. However, the applications of this concept in the context of building installation projects have not yet been fully studied in the literature. The present research presents an analysis of the workflow of the elaboration of plumbing projects within the BIM process. The research methodology was based on semi-structured interviews with professionals who are inserted in this process (modelers, designers, managers, etc.). Through the interview reports, it was possible to identify twelve agents participating in the process, divided into two hierarchical chains based on the project's contracting models. These agents were characterized based on their role in the process and their attributions catalogued in the stages to which they were related. Thus, a workflow was proposed to enable the development of the water-sanitary design within the BIM process. The workflow was evaluated by the same participants of the interviews, who showed the feasibility of the proposal's application, as well as its positive impacts. The importance of the results of this research is given in the understanding of the role of the agents involved in the conception of the project and the mapping of this process enables the understanding the production chain in a semi-linear way, observing the dependency relationships between the activities and evaluating the stages in which they occur.
Palavras-chave: Integração da informação
Information integration
Instalações hidrossanitárias
Plumbing installations
Fluxo de trabalho
Workflow
Gestão de Projeto
Project management
CNPq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL::INSTALACOES PREDIAIS
Idioma: por
País: Brasil
Editor: Insitituto Federal de Educação, Ciência e Tecnologia de Goiás
Sigla da Instituição: IFG
metadata.dc.publisher.department: Câmpus Jataí
Citação: ASSIS, Gabriel Araujo. Análise do fluxo de trabalho na concepção de um projeto de instalações hidrossanitárias dentro do processo BIM. 2022. Monografia (Bacharelado em Engenharia Civil) - Instituto Federal de Goiás, Jataí, 2022.
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.ifg.edu.br:8080/handle/prefix/2287
Data do documento: 2-Dez-2022
Aparece nas coleções:Bacharelado em Engenharia Civil

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
tcc_Gabriel Araujo Assis.pdfTCC4,13 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.