Título: A contribuição das ferramentas de gestão de obras no aumento da produtividade em condomínios horizontais – estudo de caso
Título(s) alternativo(s): The contribution of construction management tools to increasing productivity in horizontal condominiums – case study
Autor(es): Souza, Emilly de Paula
Primeiro Orientador: Domiciano, Marcela Leão
metadata.dc.contributor.referee1: Domiciano, Marcela Leão
metadata.dc.contributor.referee2: Silva Junior, Paulo Francinete
metadata.dc.contributor.referee3: Pacheco, Gabriela Cristina Ribeiro
Resumo: O gerenciamento e planejamento de obras, atualmente, é fator imprescindível para o sucesso dos empreendimentos no âmbito da construção civil, uma vez que permite um maior controle sobre os processos executivos que dificultam a chegada ao produto final (edificação), além de mapear as dificuldades, identificar os problemas quanto à mão de obra, aos insumos e materiais, aos equipamentos e até mesmo empecilhos no próprio ato de planejar. Assim, por meio das ferramentas de gestão, o planejamento deve ser capaz de prever as adversidades, traçar estratégias de correção e prevenção e impedir a propagação de erros que atrapalhem o bom andamento do fluxo de trabalho, utilizando como fundamento a aplicação da filosofia do Lean Construction que visa uma produção limpa, organizada e padronizada. Portanto, este estudo, buscou apresentar algumas ferramentas empregadas, como, por exemplo, a Linha de Balanço, o Kanban, o Relatório A3, bem como suas vantagens na rotina da construção civil. Foram abordados dois panoramas distintos – em duas obras – para fins de comparação, o primeiro isento de qualquer intervenção do programa de planejamento e gerenciamento de obras, e o segundo com a implantação das mudanças no pensar operacional, com o uso das premissas do Lean Construction. Dessa maneira, avaliou-se pontos de impacto e melhoria entre as obras apresentadas, sobretudo, no que se diz respeito à produtividade. Identificou-se, com a descrição da aplicabilidade das ferramentas de planejamento, e a implantação de outras práticas gestão, as mudanças benéficas no segundo empreendimento em detrimento do primeiro, evidenciando a importância dos métodos de gestão em sua integralidade temporal.
Abstract: Construction management and planning are currently essential factors for the success of projects in the construction industry, since they allow greater control over the executive processes that hinder the arrival of the final product (building), in addition to mapping difficulties, identifying problems related to labor, inputs and materials, equipment and even obstacles in the act of planning itself. Thus, through management tools, planning must be able to foresee adversities, outline correction and prevention strategies and prevent the propagation of errors that hinder the smooth running of the workflow, using as a basis the application of the Lean Construction philosophy that aims at clean, organized and standardized production. Therefore, this study sought to present some tools used, such as the Balance Line, Kanban, and the A3 Report, as well as their advantages in the construction industry routine. Two distinct scenarios were addressed – in two projects – for comparison purposes, the first exempt from any intervention by the planning and management program of projects, and the second with the implementation of changes in operational thinking, using the premises of Lean Construction. In this way, points of impact and improvement were evaluated between the projects presented, especially with regard to productivity. With the description of the applicability of the planning tools, and the implementation of other management practices, the beneficial changes in the second project were identified to the detriment of the first, highlighting the importance of management methods in their temporal integrality.
Palavras-chave: Construção civil
Civil construction
Planejamento
Planning
Gerenciamento
Management
Lean Construction
Lean Construction
Produtividade
Productivity
CNPq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
Idioma: por
País: Brasil
Editor: Insitituto Federal de Educação, Ciência e Tecnologia de Goiás
Sigla da Instituição: IFG
metadata.dc.publisher.department: Câmpus Goiânia
Citação: SOUZA, Emilly de Paula. A contribuição das ferramentas de gestão de obras no aumento da produtividade em condomínios horizontais – estudo de caso. 2024. Trabalho de Conclusão de curso (Curso de Engenharia Civil do Instituto Federal de Educação, Ciência e Tecnologia de Goiás, IFG, Brasil.). Goiânia, 2024.
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.ifg.edu.br:8080/handle/prefix/2101
Data do documento: 2-Out-2024
Aparece nas coleções:Bacharelado em Engenharia Civil

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
tcc_Emilly Souza.pdf4,12 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.