Use este identificador para citar ou linkar para este item:
https://repositorio.ifg.edu.br/handle/prefix/2418| Tipo: | Trabalho de Conclusão de Curso |
| Título: | Análise do cronograma físico-financeiro do restaurante universitário - Campus Anápolis |
| Título(s) alternativo(s): | Analysis of the Physical-Financial Schedule of the University Restaurant - Anápolis Campus |
| Autor(es): | Lima, Marcelo Silva de |
| Primeiro Orientador: | Costa, Valéria Conceição Mouro |
| metadata.dc.contributor.referee1: | Costa, Valéria Conceição Mouro |
| metadata.dc.contributor.referee2: | Aleixo, Frederico de Souza |
| metadata.dc.contributor.referee3: | Braga, Igor Cezar Silva |
| Resumo: | O planejamento de obras e projetos é fundamental para garantir que construções sejam realizadas de forma eficiente, dentro dos prazos, orçamentos e padrões de qualidade estabelecidos. Esse processo abrange o planejamento, a execução e o controle das atividades, envolvendo a alocação de recursos, a gestão de equipes e a comunicação entre as partes interessadas. No entanto, o setor enfrenta diversos desafios, como a baixa produtividade, que resulta em atrasos e aumento de custos, e o desperdício de materiais e mão de obra, que impacta as finanças. Além disso, a resistência à adoção de inovações e novas tecnologias limita a eficiência e a competitividade das obras. Outro problema significativo é a dificuldade em equilibrar os prazos de execução com os custos, especialmente em um cenário de orçamentos restritos. Por fim, a dependência de métodos tradicionais de planejamento, em vez de abordagens sistemáticas, pode levar a falhas na execução, tornando ainda mais evidente a necessidade de práticas de planejamento eficazes e inovadoras no setor da construção civil. Assim, o objetivo principal deste estudo de caso é fazer a análise comparativa entre o cronograma físico-financeiro proposto pela construtora com as medições da construção do restaurante estudantil do IFG câmpus Anápolis, para evidenciar as razões de possíveis adiantamentos, atrasos e oneração dos custos, além de um estudo bibliográfico baseado na literatura que aborda o tema, é indubitável que um bom planejamento, gerenciamento de projetos e revisões durante todo o processo levam ao sucesso do mesmo. Pôde-se verificar que, o cronograma físico financeiro, utilizou-se de valores que definem o cronograma, o financeiro e o progresso físico da obra. As variações negativas de custo e prazo definidos pelo método de análise de valor agregado indicam que a obra está em atraso e, os índices de desempenho abaixo de 1, indicam que o desempenho está abaixo do esperado com relação ao cronograma e orçamento planejados. Como resultado dos indicadores mencionados, ao analisar o andamento do projeto verifica-se que a obra possui 71,09% concluída e de acordo com o cronograma deveria estar em 100%. |
| Abstract: | Construction and project planning is essential to ensure construction is carried out efficiently, within deadlines, budgets, and to established quality standards. This process encompasses the planning, execution, and control of activities, involving resource allocation, team management, and communication between stakeholders. However, the sector faces several challenges, such as low productivity, which results in delays and increased costs, and wasted materials and labor, which impacts finances. Furthermore, resistance to the adoption of innovations and new technologies limits the efficiency and competitiveness of projects. Another significant problem is the difficulty in balancing execution deadlines with costs, especially in a context of tight budgets. Finally, reliance on traditional planning methods, rather than systematic approaches, can lead to execution failures, further highlighting the need for effective and innovative planning practices in the construction sector. Thus, the main objective of this case study is to compare the physical-financial schedule proposed by the construction company with the measurements taken during the construction of the IFG Anápolis campus student cafeteria. This analysis aims to highlight the reasons for possible advances, delays, and cost overruns. In addition to a bibliographical study based on the literature on the topic, it is undeniable that good planning, project management, and reviews throughout the process lead to success. It was found that the physical-financial schedule used values that define the schedule, financial, and physical progress of the project. Negative cost and schedule variances, defined by the earned value analysis method, indicate that the project is behind schedule, and performance indices below 1 indicate that performance is below expectations relative to the planned schedule and budget. Based on the aforementioned indicators, analyzing the project's progress reveals that the project is 71.09% complete. |
| Palavras-chave: | Gerenciamento; Planejamento; Custo; Orçamento; Prazos; Obras. |
| CNPq: | Grande área: Engenharias / Área: Engenharia Civil / Subárea: Construção Civil/Especialidade: Processos Construtivos. |
| Idioma: | por |
| País: | Brasil |
| Editor: | Insitituto Federal de Educação, Ciência e Tecnologia de Goiás |
| Sigla da Instituição: | IFG |
| metadata.dc.publisher.department: | Câmpus Anápolis |
| Citação: | LIMA, M. S. Análise do cronograma físico-financeiro do restaurante universitário campus Anápolis. 2025. 72 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil da Mobilidade) – Instituto Federal de Educação, Ciência e Tecnologia de Goiás, Campus Anápolis, Anápolis, 2025. |
| Tipo de Acesso: | Acesso Aberto |
| URI: | http://repositorio.ifg.edu.br:8080/handle/prefix/2418 |
| Data do documento: | 29-Ago-2025 |
| Aparece nas coleções: | Bacharelado em Engenharia Civil da Mobilidade |
Arquivos associados a este item:
| Arquivo | Descrição | Tamanho | Formato | |
|---|---|---|---|---|
| TCC MARCELO SILVA DE LIMA.PDF | TCC_Marcelo Silva de Lima | 3,75 MB | Adobe PDF | Visualizar/Abrir |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.