Use este identificador para citar ou linkar para este item: https://repositorio.ifg.edu.br/handle/prefix/2363
Tipo: Trabalho de Conclusão de Curso
Título: Estudo de caso: principais causas no desvio de prazo de uma obra vertical na cidade de Goiânia, Goiás
Título(s) alternativo(s): Case Study: Main Causes of Schedule Delays in a Vertical Construction Project in the City of Goiânia, Goiás
Autor(es): Araujo, Paulo Victor Ribeiro
Primeiro Orientador: Ferreira, Ricardo de Alcântara
metadata.dc.contributor.referee1: Ferreira, Ricardo de Alcântara
metadata.dc.contributor.referee2: Borges, Lianna de Lucca Jardim
metadata.dc.contributor.referee3: Mendes, Marcus Vinicius
Resumo: O presente trabalho teve como objetivo identificar as principais causas de atraso em uma obra vertical na cidade de Goiânia, com foco na análise dos processos de planejamento e controle. A pesquisa abordou fatores que impactam diretamente o cumprimento de prazos, como falhas logísticas, alterações de projeto durante a execução, condições climáticas adversas, deficiências na comunicação entre as equipes e má gestão de recursos, incluindo a falta de materiais e de mão de obra qualificada. A metodologia adotada combinou abordagens quantitativa e qualitativa, por meio da coleta e análise de dados referentes a uma obra acompanhada ao longo de um ano. Foram utilizadas planilhas contendo indicadores de desempenho, como o Percentual de Progresso das Conclusões (PPC), para avaliar, de forma prática, os desafios encontrados no canteiro de obra. Os resultados evidenciaram as falhas mais recorrentes de planejamento e execução, possibilitando a caracterização das principais causas de atraso na obra estudada. Conclui-se que a identificação dessas causas contribui para compressão de obstáculos à eficiência no cumprimento de prazos, oferecendo subsídios para futuros estudos e aprimoramentos nas práticas de gestão de obras.
Abstract: This study aimed to identify the main causes of delays in a high-rise construction project in the city of Goiânia, with the purpose of proposing improvements in planning and control processes. The research addressed factors that directly affect schedule compliance, such as logistical failures, design changes during execution, adverse weather conditions, communication deficiencies among teams, and poor resource management — including shortages of materials and qualified labor. The methodology combined both quantitative and qualitative analyses through the collection of data from construction projects carried out over the course of one year. Spreadsheets were organized to calculate indicators such as the Percent Plan Complete (PPC), in addition to conducting interviews and field observations in order to understand, from a practical perspective, the challenges faced on construction sites. The results revealed the most frequent planning and execution failures and allowed the proposal of feasible solutions to mitigate these problems. Therefore, this study contributes directly to improving time and resource management in the construction industry, promoting more realistic schedules, reducing delays, and increasing the efficiency of project delivery.
Palavras-chave: planejamento de obras
controle de prazos
atraso na construção civil
causas de atraso
Goiânia
CNPq: CNPQ::ENGENHARIAS::ENGENHARIA CIVIL::CONSTRUCAO CIVIL
Idioma: por
País: Brasil
Editor: Insitituto Federal de Educação, Ciência e Tecnologia de Goiás
Sigla da Instituição: IFG
metadata.dc.publisher.department: Câmpus Goiânia
Citação: ARAÚJO, Paulo Victor Ribeiro. Estudo de caso: principais causas no desvio de prazo de uma obra vertical na cidade de Goiânia, Goiás. 2025. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) – Instituto Federal de Educação, Ciência e Tecnologia de Goiás, Goiânia, 2025.
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.ifg.edu.br:8080/handle/prefix/2363
Data do documento: 30-Jul-2025
Aparece nas coleções:Bacharelado em Engenharia Civil

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
tcc_Paulo Victor.pdf1,41 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.