Use este identificador para citar ou linkar para este item: https://repositorio.ifg.edu.br/handle/prefix/2275
Tipo: Trabalho de Conclusão de Curso
Título: Estudo técnico de planejamento para recapacitação de linha de transmissão via simulação ANAREDE
Título(s) alternativo(s): Technical planning study for the uprating of a transmission line using ANAREDE simulation.
Autor(es): Costa, Ricardo Vinicius Coelho
Fernandes, Lucas dos Santos
Primeiro Orientador: Zanin Júnior, Paulo Sérgio
metadata.dc.contributor.referee1: Aleluia Júnior, Leovir Cardoso
metadata.dc.contributor.referee2: Magalhães, Alana da Silva
metadata.dc.contributor.referee3: Oliveira, Danilo dos Santos
Resumo: O crescimento contínuo da demanda por energia elétrica no Brasil impõe desafios significativos à infraestrutura do sistema de transmissão. Em especial, as linhas existentes, localizadas em áreas urbanas densamente povoadas, enfrentam dificuldades para a abertura de novas faixas de servidão, o que limita a expansão da rede elétrica tradicional. Neste contexto, este trabalho propõe a análise e recapacitação de um sistema radial que abastece o município de Porangatu (GO), visando o reforço da confiabilidade e da capacidade de transmissão entre os barramentos PORANG-GO069 e PORANG-GO138*. O estudo de caso foi conduzido por meio de simulações computacionais utilizando o software ANAREDE, com análise do fluxo de potência, níveis de tensão e carregamento para projeções futuras até o ano de 2054. Os resultados indicaram que a configuração atual apresenta sobrecargas superiores a 20% em determinados cenários, evidenciando a necessidade de intervenção. A substituição dos condutores por cabos ACSR de maior ampacidade (477 MCM, 605 MCM e 795 MCM) proporcionou aumentos de até 35% na capacidade de transmissão, adequando a linha às exigências futuras de carregamento e eliminando problemas de subtensão e sobrecorrente. Como implicação prática, a adoção das soluções propostas poderá prolongar a vida útil da infraestrutura existente, minimizar investimentos em novas linhas e assegurar a continuidade do fornecimento elétrico de maneira segura e eficiente para a região atendida. A ausência de medidas corretivas poderá acarretar restrições operativas severas, comprometendo a estabilidade e a confiabilidade do sistema elétrico regional.
Abstract: The continuous growth in electricity demand in Brazil poses significant challenges to the power transmission infrastructure. In particular, existing lines located in densely populated urban areas face difficulties in the expansion of traditional networks due to restrictions on opening new easement corridors. In this context, this study proposes the analysis and uprating of a radial transmission system supplying the municipality of Porangatu (GO), aiming to enhance the reliability and transmission capacity between the PORANG-GO069 and PORANG-GO138* substations. The case study was conducted through computational simulations using the ANAREDE software, analyzing power flow, voltage levels, and loading for future projections up to the year 2054. The results indicated that the current configuration experiences overloads exceeding 20% in certain scenarios, highlighting the need for intervention. The replacement of conductors with higher ampacity ACSR cables (477 MCM, 605 MCM, and 795 MCM) enabled up to a 35% increase in transmission capacity, ensuring compliance with future loading demands and eliminating issues related to undervoltage and overload. As a practical implication, the adoption of the proposed solutions can extend the service life of the existing infrastructure, minimize the need for costly new transmission lines, and ensure the safe and efficient continuity of power supply in the region. Failure to implement corrective measures may lead to severe operational restrictions, compromising the stability and reliability of the regional power system.
Palavras-chave: Recapacitação; Linha de transmissão; Estudo de caso; Sistema elétrico de potência; ANAREDE; Fluxo de potência; Cabos condutores; Sobrecarga; Subtensão
Rehabilitation; Transmission line; Case study; Electrical power system; ANAREDE; Power flow; Conductor cables; Overload; Undervoltage
CNPq: Engenharias; Engenharia Elétrica; Análise de Sistemas Elétricos
Idioma: por
País: Brasil
Editor: Insitituto Federal de Educação, Ciência e Tecnologia de Goiás
Sigla da Instituição: IFG
metadata.dc.publisher.department: Câmpus Goiânia
Citação: FERNANDES, Lucas dos Santos; COSTA, Ricardo Vinícius Coelho. Estudo técnico de planejamento para recapacitação de linha de transmissão via simulação ANAREDE. 2025. Trabalho de Conclusão de Curso – Instituto Federal de Educação, Ciência e Tecnologia de Goiás, Goiânia, 2025.
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.ifg.edu.br:8080/handle/prefix/2275
Data do documento: 22-Mar-2025
Aparece nas coleções:Bacharelado em Engenharia Elétrica

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
tcc_ Lucas Fernandes_Ricardo Costa.pdfTrabalho de Concusão de Curso6,49 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.